Home About us DgllDesk RTI Act Districts New Projects Related Links IALA Feedback Contact us
  Organizational Setup  
  Director Desk  
  Important Tourist Place  
  LIGHTHOUSES  
  Plans and Projects  
  Tenders  
  Contact Us
     
     
  Back  
  Welcome to MOUNT DILLI LIGHT HOUSE
 

           

Directorate of Lighthouses & Lightships, Cochin20

MASTER LEDGER

MOUNT DILLY LIGHTHOUSE

 

 

1.

Name

:

MOUNT DILLY

2.

Sr.No (in A.L.O.L)

:

F 0669.5

3.

Position

:

Lat

12° 0.40’ N

Lon

75° 12.2’ E

4.

Elevation

:

62 m

5.

Characteristic

:

Fl (2) W 20Sec

 

Tel No.

 

04985-230232

6.

Range in N miles

 

 

 

(i)

Luminous

:

19.6 NM

 

(ii)

Geographical

:

20.5NM

7.

Lighthouse Tower

 

 

 

(i)

Type

:

Triangular Masonry Tower

 

(ii)

Height

:

18 m

 

(iii)

Colour Scheme

:

Red & White Bands

8.

Optical Equipment

 

 

(a)

Optic

:

 

 

(i)

Make

:

J.Stone & Co, Kolkata

 

(ii)

Size

:

300 mm (IVth Order large) Revolving

 

(iii)

No of panels

:

2

 

(iv)

Area of dioptric portion

:

405 cm2

 

(v)

Area of catadioptric portion

:

1520 cm2

 

(vi)

Total Corrected Area

:

1925 cm2

 

(vii)

Divergence

:

 

 

Horizontal

:

07o 38’ 24’’

Vertical

:

11o 27’ 14’’

 

(viii)

Duration of flash

:

0.6 Sec

(b)

Pedestal

:

Ball bearing type

(c)

Rotation device

:

Dual stepper motor (20 Kg/cm2) cap

(d)

RPM

:

3 RPM (one revolution in 45 Sec)

(e)

Illuminant

:

Cluster of 3 Nos150W/230V MH lamp

(f)

Effective beam intensity

:

93000 Candela

 9.

Lantern

 

(i)

Diameter

:

2.40 m

 

(ii)

Height of glazing

:

1300 m

 

(iii)

No panels

:

12

 

(iv)

Ventilator

:

11

 

(v)

Make

:

ANA/FLEAK

10.

Energy source

 

(i)

Local Mains

:

Main supply 440 V,3 Æ,50 Hz KSEB

 

(ii)

Emergency

:

UPS

 

(iii)

Stand By

:

Genset 5 KVA, 220 V, 1 Æ,50 Hz

11.

Details of UPS

Sr No

Make

Capacity

Input

Output

Qty

1

Celtron

500VA

12Vdc

230Vac

3

12.

No of Generator Set

:

1 No

 

Details of Diesel engine

Sr No

Engine

Make

Type

No. of cylinders

RPM

HP

Cooling

1

02.1005/93128

Kirloskar

HA294

2

1500

19

Air

 

Details of Alternator

Sr. No

Serial No

Make   

KVA

Volts

Hz

Ph

RPM

1

93 AH232-27

Kirloskar

15

240

50

Single

1500

13.

Automatic voltage stabilizer

Sr No

Make

Type

Capacity

Input

Output

Qty

1

Solar

Servo controlled

5 KVA

180-270 V

230 V

2 Nos

14.

Batteries

Sr No

Where Used

Qty In Nos

Type

Make

Volts

Amp -Hr

(a)

Engine Start

1

Lead acid

Exide

12

180

(b)

Stepper Motor

1

Lead acid

Exide

12

180

(c)

UPS

2

Lead acid

Exide

12

150

(d)

Racon

1

Lead acid

Exide

12

150

15.

Fire Fitting Equipments

S No

Equipment

Type

Capacity

Qty

(i)

Fire Extinguisher

Foam type

9 lit

3 No

(ii)

Fire Extinguisher

DCP type

3.2 kg

5 Nos

(iii)

Sand Buckets

-

-

2 Nos

(iv)

Water Buckets

-

-

2 Nos

16.

Communication

:

Telephone No 04985230232

 

 

Intercom provided between Tower, Power house & Head light keeper’s quarters

17.

Water Supply

:

Open well at the foot of the hill with an electric pump 12.5 HP, 440 V pumped to an overhead tank of RCC 6500 liters. Running water available in all quarters

 

 

 

 

 

 

1 8.

Land

 

(i)

Area

:

2.5194Hectare

(ii)

Demarcation

:

Partially consisting of RCC panels fixed in grooves of RCC posts

(iii)

No of fruit bearing Coconut trees

:

34 Nos

(iv)

No of non –fruit bearing trees

:

35 Nos

 

 

 

 

 

19.

Building

:

Power house, Inspection quarters, One HLK quarters, Twin unit of ALK quarters and one twin unit of LHA & safaiwala quarters, Pump house

 

 

 

 

20.

Type of compound wall

:

Brick masonry & RCC panels

 

 

 

 

 21.

Street Lighting

:

10Nos G.I poles with fluorescent fittings.2 Nos GI pole s with bulbs

 

 

 

 

22.

Staff

:

HLK (Sr)

- 1No

 

 

ALK( Sr)

- 2 No

 

LHA

- 1No

 

Safaiwala

- 1No

 

 

 

 

23.

Mode of approach

:

By rail up to Payyannoor & by road 15 Km by bus

 

 

 

 

24.

Facilities available

:

Police Station, High School, 15 Km from LH. Post office & Dispensary 2 Km from L.H.  

25.

Postal address

:

Head Light Keeper, Mount Dilly  LH    (via)   Ramanthaly, Ettikkulam P.O,   Dist. Cannanore, pin 670308

26.

Cost of construction

:

Rs 10,06,000/-

27.

Cost of Equipment

 

Rs 4,79,653/-

28.

Date of Commissioning

:

23.06.1979

29.

Remarks

 

(i)

Conversion from PV to incandescent equipment

:

17.02.1994

 

(ii)

Incandescent equipment to MH lamp

:

05.08.1999

 

(iii)

Commissioning of 3 point lamp changer

:

19.07.1998

 

(iv)

Commissioning of direct drive equipment

:

06.06.2002

 

(v)

Commissioning of cluster lamp

:

21.12.2003

 

The nearest Railway station is Payyannur on Mangalore-Shoranur route. The lighthouse is about 16.5 km from the Railway station. This region is part of Malabar in north Kerala. There is an all weather road connecting Lighthouse to the Railway station. The Lighthouse is situated on the headland Kotte Kunnu. A ruined fort also stands near to the Lighthouse on Kotte Kunnu. 

Near by Azhikal port was a flourishing port of Ullal kingdom in the 15th century. During that period the vessels used to be guided by a day mark raised on Kotte Kunnu (Mt Dilli). The export of spices to Arab countries was the main occupation of the region. The Kotte Kunnu being a conspicuous bluff the establishment of a regular Lighthouse was not felt necessary during the olden days. The LH expert Mr D. Alan Stevenson on his visit to the Malabar coast in Decemger 1926 had recommended to establish a powerful lighthouse at this site on Mt Dilli.  

With the increase in traffic close to the coast and due to a wreck in 1965 it was decided to build a Lighthouse on the top of Kotte Kunnu. The Tower construction was completed in 1978 and PV equipment supplied by M/s. J Stone & Co. of India, was installed on the tower and the Lighthouse was commissioned into service to mariners on 23rd June 1979.

The PV light source was replaced by 100V 1500W incandescent electric lamp on 15th March 1994. The incandescent lamp was later on replaced by 230V 400 W Metal Halide lamp on 5th August 1998. The direct drive system operated by stepper motor was integrated on 15th September 1997.

 
  Copyrights © dgllnoida.gov.in